Core Switch Swap from Thu 12 Feb, 2026 21:00 GMT to Fri 13 Feb, 2026 03:00 GMT
Scheduled maintenance
Broadband4 Internet Services for Education
Broadband4 Leased Line Services
Broadband4 Filtering Services
Broadband4 FTTP/FTTC/ADSL Services
Logi-Call Connectivity Services
Logi-Call Leased Line Connectivity
Logi-Call FTTP/FTTC/ADSL Connectivity
MyCloud Services
MyCloud Email Filtering
MyCloud Web Hosting
MyCloud Offsite Backup Services
MyCloud Hosted Exchange Services
MyCloud Desktop Services
MyCloud Voice Services
Thu 12 Feb, 2026 21:00 GMT
· 6 hours
Updates
Essential
Tue 10 Feb, 2026 · 12:05 GMT
After working with the hardware vendor, it has been determined that some core switching hardware in one of our London datacentre racks has a hardware fault. A maintenance window has been scheduled to swap out the hardware for loan hardware, whilst the impacted devices are returned for repair.
The swapout will be carried out in a staged manner to minimise service impact, however there will be brief periods of outage during this window. As such service should be regarded as “at risk” from the start of the maintenance window, until a further update is posted.
← Back
.png?v=63771228261)